03 October 2003 Status at The Aquatic Hillcrest
Headline: Another Pause in the Action
The system went to tactical pause after 21 hours of the 24 hour test run that
precedes the 120 hour test by agreement. The team has rearranged some
parts in the Vax where it is believed the problem resides. Some additional
11A4 boards were requested form the GAF depot.
Farnham obtained a logic analyzer and the necessary paperwork with the help
of Brian Budwey and Frank Mahoney. Todd Mobley has obtained the
necessary software and licenses to allow transfer of binary files from the Vax
to the laptop for e-mail transmission back to the Systems Engineering expertise
in Syracuse. This software will be shipped to the radome "overnight."
The Friday holiday in Germany did not affect support by the GAF at the
Radome, which continues uninterrupted. BWB offices were closed, which
prevented any further discussion on the exchange of agreements. All
signatures discussed so far with respect to this agreement have been provided,
and all parties have done their part.
Punchlists:
Remaining Items to Perform at
Radome:
Re-attach Row N21-N26 cable and interlock cable - Bill
- Word 1 of the Platform Control Word is indicating an intermittent fault in
the 1st LO. The word is 040210 Octal and we are also seeing a red LO
fault light on the A10 PE.
- Cable label application (when the correct labels arrive from Syracuse)
- Replace GFCI (when it arrives from Syracuse) - Bill
- Replace CB9 50A breaker when it arrives from GAF or Syracuse - Bill
Need to obtain locally in Germany:
- Silicone spray lubricant
Needed from Syracuse:
Item(s) |
Requested |
DHL Air Waybill |
Picked Up |
Elapsed Days |
Status |
Torque Wrench |
18 September |
9453134390 |
9/25 01:48 |
|
in Frankfurt Customs at EGL 9/30 |
Kor-Lite Batteries |
18 September |
9453134412 |
9/25 01:47 |
|
in Frankfurt Customs at EGL 9/30 |
GFCI |
15 September |
9453134401 |
9/25 01:49 |
|
Terry Moselle ordering 10/2 |
RF Switch |
18 September |
9453134434 |
9/26 17:14 |
|
Shipment on hold in Brussels, wrong delivery |
2nd LO Generator (11A19A6) |
24 September |
EGL |
given to EGL in Frankfurt 24 September |
|
Received in NYC 29 Sep, to be sent to Guy Blasi |
50A Circuit Breaker |
27 September |
|
|
|
Terry Moselle ordering 10/2 |
3 Row Receivers |
30 September |
|
given to EGL in Frankfurt 30 September |
|
shipped to US 30 September via EGL |
1 Noise Detector |
30 September |
|
given to EGL in Frankfurt 30 September |
|
shipped to US 30 September via EGL |
Maxtor ProDrive disk drive for the RES |
29 September |
|
|
|
Terry Moselle ordering 10/2 |
37 pin protocol analyzer interface pod cable |
03 October |
|
|
|
Greg to hand carry 4 Oct |
Logic Analyzer |
03 October |
|
|
|
Greg to hand carry 4 Oct |
Software to port binary files Vax - Laptop |
04 October |
|
|
|
Todd Mobley shipping 08 Oct |
Link to Record Run Status
Photos from today:
|