Test

Status STE STE Cal Date

23a 4.2.1.1

Signed

Multimeter

17-Feb-04

23a 4.2.1.2

Signed

Oscilloscope

10-Nov-03

23a 4.2.1.3.1

Signed

23a 4.2.1.3.2

Signed

23a 4.2.1.3.3 (3E)

Signed

Clinometer

31-Mar-04

23a 4.2.1.3.4

Signed

Dial Test Indicator

Sep-04

23a 4.2.1.3.5

Signed

23a 4.2.1.3.6 (3I)

Signed

Transit Assembly

NA

23a 4.2.2.1

Signed

23a 4.2.2.2

Signed

23a 4.2.2.2.1

Signed

23a 4.2.2.2.2

Signed

23a 4.2.2.2.3

Signed

23a 4.2.2.2.5

Signed

23a 4.2.2.2.6

Signed

23a 4.2.2.2.7

Signed

23a 4.2.2.2.8 Step 3

Signed

23a 4.2.2.2.9 steps 10-19

Signed

23a 4.2.2.2.11

Signed

23a 4.2.3.2

Signed

23a 4.2.4.2

Signed

23a 4.2.4.3

Signed

23a 4.2.4.4

Signed

23a 4.2.4.5

Signed

23a 4.2.4.6

Signed

23a 4.2.4.7

Signed

23a 4.2.4.8

Signed

23a 4.2.4.9

Signed

23a appendix a SW

Signed

23a appendix b RES

Signed

23a appendix c SSR

Signed

4A

Complete    

1D-P1

Signed

ITU Compaq 2670

NA

15E-P2

Signed

ITU Compaq 2670

NA

15C-P3

Signed    

5A

Signed    

6B-P2

Signed    

10A P3

In Progress    

10B P2

In Progress    
 

Copyright (c) 1953-2015  Gazelle Software, Syracuse, NY  All Rights Reserved.   Page Last Changed 07/04/15 10:22